Skip to main content
Residential Service

Residential & Commercial Property Refurbishment

Over decades of tenancies or wear, buildings accumulate tired wet areas, patched walls, outdated switchboards, worn common stairwells and fatigued joinery that piecemeal handyman repairs can no longer disguise.

Blok Town delivers coordinated whole-property refurbishments for residential terraces, apartments, small unit blocks and commercial properties—bundling building repairs, wet-area renewals, kitchens, flooring, lighting and exterior tidy-ups under one accountable programme.

Split architectural diagram showing an older worn room transformed with new joinery, crisp lighting, waterproofed tiling and fresh flooring.

Scope boundaries: what is included & excluded

Clear scope demarcation avoids unexpected gaps between consultants, authorities and construction trades. Final inclusions are tailored to your endorsed drawings.

What this service includes

  • Comprehensive strip-out of worn carpets, damaged cabinetry, dated light fittings and tired bathroom fixtures
  • Kitchen, bathroom and laundry renewals with certified waterproofing and durable rental- or owner-grade hardware
  • Subfloor, plaster, door hardware, window winder/seal and acoustic floor-underlay upgrades
  • Switchboard modernisations (RCD safety switches), smoke alarm upgrades and energy-efficient LED lighting
  • Common foyer, stairwell, courtyard and commercial end-of-lease make-good scopes

Explicitly excluded unless varied

  • Cosmetic-only single-room painting callouts or minor handyman maintenance tasks
  • Property management tenant leasing or real-estate sales styling fees
  • Latent structural underpinning or hazardous material remediation unless identified and scoped via variation

Who this service suits

  • Residential and commercial landlords upgrading an asset between long-term tenancies
  • Owner-occupiers refreshing a newly purchased older terrace, townhouse or commercial building before moving in
  • Small strata committees renewing shared foyers, corridors, laundries and external courtyards

Helpful client inputs to start

  • Property access window (vacant possession is strongly recommended for whole-property refurbishments)
  • Strata by-laws (especially hard-flooring acoustic ratings and wet-area rules, if strata-titled)
  • Target budget priorities (e.g. long-term rental durability vs owner-occupier custom finishes)

Typical delivery sequence

  1. Condition walk & priority scope

    We inspect the property room by room to separate essential compliance/waterproofing items from cosmetic upgrades.

  2. Durable specification lock-in

    Hard-wearing surfaces, standard-friendly fixtures and pre-ordered joinery are selected to prevent mid-build stalls.

  3. Coordinated multi-trade renewal

    Strip-out, electrical/plumbing rough-ins, waterproofing, tiling, flooring, cabinetry and painting run back-to-back.

  4. Quality sign-off & compliance pack

    Waterproofing, glazing and electrical certificates are compiled with a clean, ready-to-occupy handover.

Property Refurbishment — Frequently asked questions

In most Australian states, replacing kitchens, waterproofing bathrooms, changing hard flooring or altering walls/services in a strata lot requires owners corporation approval or a registered minor/major renovations by-law before work starts.

Related construction services

Residential

Home Alterations

Smart structural reconfigurations, load-bearing beam installations, lightwells and wet-area upgrades inside your existing walls.

View service →

Helpful planning guides

Planning property refurbishment?

Send through your suburb, site constraints and current drawing stage to discuss buildability and realistic sequencing with Blok Town.