Skip to main content
Residential Service

Ground-Floor & First-Floor Building Extensions

Extending an existing home or commercial building lets you stay in a neighbourhood you value while gaining the extra bedrooms, open living space or operational area you need.

Blok Town constructs rear ground-floor extensions, courtyard link pavilions and first-floor additions—paying close attention to structural tie-ins, roofline junctions, stormwater capacity and weatherproofing while your existing structure is opened.

Architectural diagram showing an original pitched-roof front cottage connected via a glazed link to a contemporary two-level rear extension.

Scope boundaries: what is included & excluded

Clear scope demarcation avoids unexpected gaps between consultants, authorities and construction trades. Final inclusions are tailored to your endorsed drawings.

What this service includes

  • Substructure footings, piers or slabs engineered to sit safely beside existing foundations
  • Ground-floor rear pavilion framing or upper-storey structural floor/steel tie-in systems
  • Weatherproof roof flashings, box gutters, cladding transitions and high-performance glazing
  • Upgraded stormwater drainage, electrical sub-mains and hot-water/HVAC integration
  • Seamless internal threshold transitions, stairs, joinery and courtyard deck/paving links

Explicitly excluded unless varied

  • Heritage archival recording or specialist conservation stonework unless itemised
  • Upgrading non-compliant wiring or plumbing in untouched front rooms unless discovered and varied by agreement
  • Town planning shadow diagrams and neighbour notification administration (handled during design phase)

Who this service suits

  • Homeowners adding a sunlit rear kitchen-living pavilion or a second-storey bedroom/bathroom wing
  • Heritage-overlay houses keeping a character street frontage while adding contemporary rear volume
  • Commercial owner-occupiers extending rear storage, clinic rooms or studio space onto unused land

Helpful client inputs to start

  • Approved architectural and structural drawings detailing the junction between old and new work
  • Soil report, property survey and underground sewer/stormwater diagram
  • Window schedule and external cladding selections early for lead-time ordering

Typical delivery sequence

  1. Existing structure & roof tie-in check

    We verify existing footing depths, wall plumbness and roof drainage before ordering trusses or structural steel.

  2. New footings & shell first

    Whenever site geometry allows, we build the new rear shell before breaking through the existing back wall.

  3. Breakthrough & weatherproofing

    Roof junctions, flashings and structural tie-ins are completed rapidly with heavy-duty weather protection on standby.

  4. Internal integration & handover

    Services, insulation, linings, stairs and joinery unite the original building and new extension.

Building Extensions — Frequently asked questions

Ground-floor additions avoid opening the entire main roof and reinforcing existing lower walls, though they reduce backyard area. Upper-level extensions preserve garden space but require engineered load paths down to new or underpinned footings.

Related construction services

Residential

Home Alterations

Smart structural reconfigurations, load-bearing beam installations, lightwells and wet-area upgrades inside your existing walls.

View service →

Helpful planning guides

Planning building extensions?

Send through your suburb, site constraints and current drawing stage to discuss buildability and realistic sequencing with Blok Town.